Showing posts with label December. Show all posts
Showing posts with label December. Show all posts

Friday, 2 December 2011

AMD Radeon HD 7000 Mobility GPUs to be launched on December 5?

TPU picked up a rumor that AMD's first Radeon HD 7000 series cards may be introduced next week. The mobile parts are expected to be launched first, or perhaps the company will show off its GCN architecture.
It is indicated that products launched on that day will be based on GPUs built on the 28 nanometer fabrication process. The new products will be unveiled in London. It's likely that these are mobile parts based on the "Thames" and "Seymour" silicons. An alternate theory is that AMD could unveil some of its next-generation GPUs based on the GCN architecture, AMD's biggest leap in GPU architecture since Radeon HD 2000 series.


AMD Radeon HD 7000 Mobility GPUs to be launched on December 5? - More news at DV Hardware

Acer: HDD shortage to intensify in December

Acer VP Scott Lin told DigiTimes that PC vendors will see more serious HDD supply issues in December as HDD inventory levels will soon hit bottom:
As PC brand vendors' hard disc drive (HDD) inventory level will soon hit bottom, vendors will start experiencing HDD shortages in December and the problem will reach its peak in February until recovery comes in March, according to Acer vice president Scott Lin.

Despite PC brand vendors having already taken measures to secure and expand supply sources right after Thailand's flood, sources from the upstream supply chain still estimate that the hard drive supply gap will reach 35% in the fourth quarter with PC vendors starting feeling the pressure in December.

Acer pointed out that all the newly-made notebook models will have price increases of 2-3%, in addition to the extra cost of HDD, the increased price will also cover the extra cost for adopting Intel's new CPUs such as Core i3 2330, 2430 and Core i5 2450.


Acer: HDD shortage to intensify in December - More news at DV Hardware

Thursday, 29 September 2011

NVIDIA to start 28nm mobile production in December

FUD Zilla claims NVIDIA's first 28nm mobile GPUs will hit production in December, but the site also heard that 28nm yields are not good.
The aim is for the Maho Bay platform to get its 28nm Nvidia chips and continue the good transition of Optimus graphics. The possible launch timeframe is going to be set by Intel, and we hear it will happen either in March or April of 2012.

The production of mobile chips starts in December at the latest, which means that these chips have been taped out for a while now. However, 28nm is currently not doing as great as some companies would make you think, as the yields are not good.


NVIDIA to start 28nm mobile production in December - More news at DV Hardware